How can I tell which Task is next in a Sequencer?

NodeCanvas Forums General Discussion How can I tell which Task is next in a Sequencer?

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #16927
    johnrgeraci
    Participant

    It seems that all of the examples show a nice set of connection pips at the bottom edge of a Sequencer node, but these seem have gone away in the latest version.  So how can I tell which node is the next in the sequence?

    This is what I see on my sample behavior:

    Screenshot-2023-06-23-at-4.01.51-PM-1

    And this is what I see in a random example

    Screenshot-2023-06-23-at-4.02.32-PM-1

    (I’m brand new here)

    Attachments:
    You must be logged in to view attached files.
    #16928
    johnrgeraci
    Participant

    Here are the attachments for the above

    Attachments:
    You must be logged in to view attached files.
    #16945
    Gavalakis
    Keymaster

    Hello and sorry for the late reply,

    The design of the connections has been changed in recent versions so that all connection outputs come out of a single point.

    However in both the previous design as well as the new one, the child nodes were/are always evaluated from left to right. Because of this, there was no good reason to show the connections separately. It is only a UI change, but the ordering and behaviour remain the same.

    Thank you.

    Join us on Discord: https://discord.gg/97q2Rjh

Viewing 3 posts - 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.